I have to say thank you to our customer that has trust and give us opportunities to build up condo for them from blank space, we open to learn from each-other and we continue work together on the second condo. Condo BanSathorn Chaphraya, this is a 250sqm condo with already have bathroom and basic electric wiring and cool water pipe system. Our job is, build-up 100sqm dry wall to divide living-room, bed-rooms and corridor. Tiling 250sqm tile, re-wiring for electricity, install pipes for water kitchen, install 240 meters of base board and modeling. We finished this project within 3 months.

living room

living room

456-livingroom3456-livingroom1

dining area

dining area

corridor

corridor

we started building frame for drywall

we started building frame for drywall

started building corridor

started building corridor

put-up gypsum panel

put-up gypsum panel

proper drywall

proper drywall

patch up and smooth up dry wall

patch up and smooth up dry wall

patch up and smooth up drywall

patch up and smooth up drywall

kitchen final look

kitchen final look

tiling for kitchen

tiling for kitchen

piping for water and drain

piping for water and drain

installing cabinets

installing cabinets

one of the bathroom the we renovate

one of the bathroom the we renovate

456-bathroom3456-bathroom2